Projects / Fraaiuitsig, Mossel Bay

House Elwena

New build📍 Fraaiuitsig, Mossel Bay

A three-bedroom family home on a steep, empty plot in Fraaiuitsig, with the living areas upstairs to make the most of the views over the Klein-Brak River.

House Elwena finished: white garage frame, dark grooved plaster, timber pergola and paving

About this project

The slope was the first challenge. We excavated deep into the bank, compacted the platform in layers and built reinforced brick retaining walls to hold it, then laid steel and a damp-proof membrane before the foundations went in.

To lift the living areas above the double garage, we cast a suspended beam-and-block slab with a reinforced edge beam, poured by concrete pump. The upper walls, gables and roof followed, then ceilings and plaster, with a dark grey grooved plaster finish on the upper walls.

The result is an open-plan kitchen and living area with microcement floors, a cast concrete island and a face-brick braai, and a covered balcony with its own braai and chimney under a timber roof. A tiled staircase, a block retaining wall along the boundary and paving complete the home.

Photos

The finished project

Tap a photo to see it full size.

How we built it

From first dig to handover

Photos from site, in the order the work was done.

  1. 1

    Day one: site cleared and taped off, with the J&A Bouers board up

  2. 2

    Compacting and wetting the ground in layers before the foundations

  3. 3

    Jacques checking compaction on the excavated platform

  4. 4

    Reinforcing steel and damp-proof membrane in the foundation trenches

  5. 5

    Foundation brickwork going up, with profiles set up for the walls

  6. 6

    Reinforced brick retaining wall against the cut bank

  7. 7

    The team passing bricks down into the trenches

  8. 8

    Precast beams and blocks laid out for the suspended slab

  9. 9

    Reinforcing steel in the slab's edge beam, ready for concrete

  10. 10

    Concrete pump in position for the suspended slab pour

  11. 11

    The team levelling the concrete as the pump pours the slab

  12. 12

    Brickwork up to the gables, with the first roof timbers going on

  13. 13

    Upstairs walls and gable going up on the new slab

  14. 14

    Roof trusses up over the open-plan living area, with views over the valley

  15. 15

    Jacques with the team as the roof timbers and ceiling battens go in

  16. 16

    Roof tiles on and window openings protected

  17. 17

    Roof tiled and chimney up while the team builds the balcony braai

  18. 18

    Plastering the walls, including the grooved finish upstairs

  19. 19

    Ceilings boarded and taped, with the walls plastered

  20. 20

    Plastering the balcony braai, with face-brick arch and alcove

  21. 21

    Balcony braai and chimney up, with views over the valley

  22. 22

    Timber beams going up over the balcony

  23. 23

    Balcony roofed, with ceiling and downlights in

  24. 24

    Building a block retaining wall along the side boundary

  25. 25

    Paving down and final deliveries arriving before handover