The stone cladding on the second and third floors of this Diaz Beach apartment block had started coming loose and falling, a real danger to residents and cars below.

Before: the cladded bay from the side
Before
After: cladding removed, plastered and painted to match the building
After

About this project

Working three storeys up meant safety came first. We put up scaffolding, barricaded the area underneath and worked in harnesses the whole way.

With the cladding off, the bay needed a proper base before it could be finished. Once that was done, we plastered and painted it in the building's existing colour. Today you'd never know it was ever clad. It looks like it was always part of the original design.

How we built it

From first dig to handover

Photos from site, in the order the work was done.

  1. 1

    Before: the stone cladding on the second and third floors had started to come loose

  2. 2

    Scaffolding up and the area below barricaded

  3. 3

    J&A Bouers on site at Portobello

  4. 4

    Removing the loose cladding, with the team in safety harnesses

  5. 5

    Plastering the prepared wall

  6. 6

    The bay plastered and ready for paint